ESTES BROS. CONST. INC.
JONESVILLE, VA · UEI YKVNGM329N76 · CAGE 1TXC5
Awarded (5-yr transactions)
$27.5M
Set-aside awards seen
5
Latest period end
Jan 2028
Largest contract awards
- 693C7323C000018$64.3M
PROJECT: NP NP BLRI 1L9, 1M22, ETC - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 24 MILES OF THE BLUE RIDGE PARKWAY (BLRI) BETWEEN MILEPOST (MP) 97 AND 121 IN BEDFORD, BOTETOURT, AND ROANOKE COUNTIES, VIRGINIA. THE WORK CONSISTS OF RE
Federal Highway Administration · NAICS 237310 · Sep 2023 – Jul 2028 · official record ↗
- 693C7321C000001$62.1M
TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9.
Federal Highway Administration · NAICS 237310 · Nov 2020 – May 2025 · official record ↗
- 693C7325C000008$32.6M
NP NATR 3N18, 3H27, ETC - GEOTECHNICAL, PAVEMENT REHABILITATION, AND STRUCTURAL REPAIRS BETWEEN MP 121 AND MP 204 (PHASE 2), PROJECT MS NP NATR 3N18 3H27 ETC, SOLICITATION NUMBER 693C73-25-B-000003, LOCATED IN ATTALA, CHOCTAW, LEAKE, MADISON, AND WEB
Federal Highway Administration · NAICS 237310 · Apr 2025 – Jun 2027 · official record ↗
- 693C7322C000006$28.6M
PROJECT NP-FOOT 8G16, 8H10: THE WORK INCLUDES FULL DEPTH RECLAMATION OF FOOTHILLS PARKWAY SECTIONS 8G AND 8H MAINLINE, PARKING AREAS, AND PULL-OFFS; ESTABLISHING ROADSIDE DITCHES AND RECONDITIONING PAVED WATERWAYS; REPLACING SIGNS AND PAVEMENT MARKI
Federal Highway Administration · NAICS 237310 · Jan 2022 – Jun 2024 · official record ↗
- 693C7324C000009$23.1M
PROJECT NP NATR 3N17, 3H26, ETC. - THE PROJECT CONSISTS OF THE DRAINAGE IMPROVEMENTS OF THE NATCHEZ TRACE PARKWAY (NATR) FROM MILEPOST (MP) 121 TO MP 204 INCLUDING SOME PARKING AREAS. THE WORK CONSISTS OF DESIGN AND INSTALLATION OF DESIGNATED INLETS
Federal Highway Administration · NAICS 237310 · Jun 2024 – Jan 2028 · official record ↗
- DTFH7115C00006$13.9M
IGF::OT::IGF PROJECT: PRA-GRSM 1A28 THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 6.3 MILES OF NEWFOUND GAP ROAD FROM TN MILEPOST 0.0 TO 6.3, INCLUDING ROADSIDE PULLOUTS AND PARKING AREAS, AS WELL AS REHABILITATION WORK ON RIVER ROAD AND THE GATLINBURG BYPASS, ALL WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL-DEPTH PAVEMENT PATCHING, SUPERPAVE ASPHALT CONCRETE PAVEMENT OVERLAY, STONE MASONRY AND GUARDWALL REPAIRS, SHOULDER AND EMBANKMENT STABILIZATION WITH THE CONSTRUCTION OF SOLDIER PILE (STEEL H-PILE) RETAINING WALLS WITH PERMANENT GROUND ANCHORS AND EITHER PRECAST CONCRETE LAGGING OR STONE MASONRY FACING, BRIDGE REPAIRS AND POLYESTER POLYMER CONCRETE BRIDGE DECK OVERLAY, STEEL-BACKED TIMBER GUARDRAIL, DRAINAGE, AND OTHER MISCELLANEOUS WORK.
Federal Highway Administration · NAICS 237310 · Feb 2015 – May 2020 · official record ↗
- 693C7326F00007N$13.2M
PROJECT NC NP BLRI 2M30: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 342.7, 343.7 AND 343.8. THE WORK INCLUDES SLIDE REPAIRS, CULVERT REPLACEMENT AND CLEANING, STONE MASONRY HEADWALL INSTALLATION, RIPRAP PLACEMENT, CURB AND GUARDRAIL IN
Federal Highway Administration · NAICS 237310 · Nov 2025 – Jun 2027 · official record ↗
- DTFH7113C00005$12.7M
IGF::OT::IGF THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 6.1 MILES OF NEWFOUND GAP ROAD FROM TN MILEPOST 6.3 TO TN MILEPOST 12.4, INCLUDING ROADSIDE PULLOUTS AND PARKING AREAS. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL-DEPTH PAVEMENT PATCHING, SHOULDER STABILIZATION, SUPERPAVE ASPHALT CONCRETE PAVEMENT OVERLAY, STONE MASONRY AND GUARDWALL REPAIRS, STEEL-BACKED TIMBER GUARDRAIL, DRAINAGE, AND OTHER MISCELLANEOUS WORK.
Federal Highway Administration · NAICS 237310 · Apr 2013 – Apr 2020 · official record ↗
- 140P2019C0067$10.7M
SHEN-222245, SHENANDOAH NATIONAL PARK FY19 PAVEMENT IMPROVEMENTS, SHENANDOAH NATIONAL PARK, MADISON, PAGE AND RAPPAHANNOCK COUNTIES, VIRGINIA
National Park Service · NAICS 237310 · Sep 2019 – Oct 2020 · official record ↗
- DTFH7115C00036$8.6M
IGF::OT::IGF PROJECT: PRA-BLRI 2F24 THE PROJECT CONSISTS OF THE RESURFACING AND REHABILITATION OF APPROXIMATELY 9.1 MILES OF THE BLUE RIDGE PARKWAY, FROM MILEPOST (MP) 283.0 TO MP 291.9, INCLUDING OVERLOOKS AND THE EXIT/ENTRANCE RAMP AT U.S. ROUTE 321. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL-DEPTH PAVEMENT PATCHING, FULL-DEPTH RECLAMATION AND CEMENT STABILIZATION OF THE EXISTING AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT OVERLAY, DRAINAGE REPAIRS AND IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.
Federal Highway Administration · NAICS 237310 · Sep 2015 – Sep 2017 · official record ↗
- DTFH7110C00054$7.9M
PROJECT GRSM 1A25 - THE PROJECT CONSISTS OF THE REHABILITATION OF 2.4 MILES OF NEWFOUND GAP ROAD FROM MILEPOST 12.4 TO THE NEWFOUND GAP PARKING AREA. THE WORK INCLUDES RETAINING WALL CONSTRUCTION, STONE MASONRY GUARDWALL CONSTRUCTION AND REPAIRS, ROADWAY EXCAVATION, ASPHALT PAVEMENT MILLING AND FULL-DEPTH RECONSTRUCTION, AGGREGATE SURFACE AND SHOULDER RECONDITIONING, HOT ASPHALT CONCRETE PAVEMENT, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK. OBLIGATE WITH 1240 TO VENDOR "SECTION 203 POO EFL"
Federal Highway Administration · NAICS 237310 · Sep 2010 – Oct 2014 · official record ↗
- 140P2021C0046$7.3M
VARIOUS PAVEMENT REPAIRS, SHEN 222242, SHENANDOAH NATIONAL PARK
National Park Service · NAICS 237310 · Mar 2021 – Sep 2022 · official record ↗
Is this your company?
Claim it free on GovScout: matched SAM.gov opportunities for your NAICS codes, incumbent intel on every recompete, and monitoring so your SAM registration never lapses.
Claim your profile — freePublic records from FPDS (via USAspending.gov) and SAM.gov. Figures reflect harvested award data and may not be complete; verify against the linked official records. Not an endorsement. Company in the data by mistake or wish to update it? Email support@usegovscout.com.